East Court Plaza located on Glen Watford Drive [Midland and Sheppard]. This is a re-roofing job with recover application. |
|
Lower roof of Ho View Plaza with 16 air conditioner Unit [ approx 3000 sqft]. Recover application with 2 ply membrane torch application. |
|
This is a flat roof town house re-roof project, re-roof the poorest condition unit of the town house. The project start from 2004 and finished in 2005 [16 unit was involved]. |
|
High rise re-roofing project. Cut off and trash down all the existing gravel build-up roof. Mop down foam insulation and re-cover board. Torch apply a new 2 ply roof membrane system. |
|
This is a remove all and install new project. Supply and install vapor retardar, 3” foam insulation [w/ hot mop], recover board, base membrane and cap membrane [w/ torch application]. |
|
East Court Plaza Re-roofing [recover] in 2007 |
|
98 Blackwell, 2004 |
|
241-251 Huntingdale Ave. [16 townhouse unit],2004 |
|
Ho View Plaza, 324 HWY 7 E., Richmond Hill 2005 |
|
165 Wellington St. W., Barrie in 2006 |


|